
Module 2 ยท Pumps, Level Controls, and Operating Cycles
Lead, Lag, and Alternation
The lead pump is the first pump called when the wet-well level rises. A lag pump starts when the lead pump cannot keep pace or when the level reaches another control point.
Alternation changes which pump becomes lead for the next cycle. This can distribute run time and starts between available units. Balanced use also helps reveal whether both pumps can perform the duty.
Unequal hours do not always mean a fault. Different pump sizes, programmed sequences, maintenance outages, or peak-flow operation may create an intended difference. Compare results with the station's control description.
If a pump is unavailable, staff must understand how capacity and alternation are affected. Record the change and follow the plant's reduced-capacity and notification procedures.
Exam Need to Know
- The lead pump starts first; the lag starts if lead cannot keep up.
- Alternation switches which pump leads each cycle to share run time.
- Pump hours that differ don't always signal a fault.
Exam area: Equipment
