Operator Master
Level ILevel IIPractice ExamMath CenterLab CourseAbout
Start Practicing
Operator Master

Free exam practice for Washington wastewater treatment operators.

AboutSupportPrivacyTermsExam Disclaimer

Appearance

Operator Master is independent and is not affiliated with WPI, PSI, ABC or the Washington State Department of Ecology.
Math MasteryLoading / Pounds
Exit

Try independently

Solve It Your Way

A plant receives 2 MGD. Influent BOD is 180 mg/L. What is the BOD loading in lb/day?

Choose one answer

Optional help

Use Only What You Need

Hints stay hidden unless you ask for them.

0
Family source boundary

Curated values teach the governed relationship among flow, concentration, and mass per day. They are not operating targets, design criteria, permit limits, process recommendations, certification weighting, or claims about a specific plant.

This Draft family uses selected mathematical facts only. It does not reproduce an official formula sheet or claim Washington exam weighting.

  • Printed page 4 of 10, Loading Rate, lb/day: Flow, MGD × Concentration, mg/L × 8.34 lb/gal
  • Printed page 8 of 10, Abbreviations: lb, L, mg, MG, and MGD
  • Printed page 9 of 10, Conversion Factors: 1 US gallon of water = 8.34 lb