OperatorMaster
Practice QuestionsPractice ExamMath CenterCoursesPremiumAbout
Start Practicing
OperatorMaster

Free study tools for water and wastewater operators.

AccountSettingsAboutVideo ToursPricing and PaymentExam Prep BooksGet the iPhone AppSupportPrivacyTermsExam Disclaimer

Appearance

Operator Master is independent and is not affiliated with WPI, PSI, ABC, the Washington State Department of Ecology or any other state or provincial certification agency.
← Back to MathHow to Use a Pie Wheel
Page 6 of 8
Jump to a Lesson
1. Pie Wheel Basics2. Find the Top3. Find a Bottom4. Place the Numbers5. Choose a Wheel6. Three-Part Wheel7. Find the Dose8. Guided Practice

Lesson 6

Three Bottom Sections: Loading

Some wheels have three bottom sections, including the 8.34 factor. To find the top, multiply all three.
Loading / PoundsTap a section to cover the quantity you want to find.

What remainsLoading = Flow × Conc. × Factor

  1. 1
    Identify unknown

    Loading

  2. 2
    Choose wheel

    Loading / Pounds

  3. 3
    Place values

    Flow: 2.0 MGD · Concentration: 150 mg/L · Factor: 8.34

  4. 4
    Cover unknown

    Loading is on top, so multiply all three bottom sections.

  5. 5
    Solve

    2.0 MGD × 150 mg/L × 8.34 = 2,502 lb/day

  6. 6
    Check units

    The answer is in lb/day, the units of the top section.

PreviousContinue