OperatorMaster
Practice QuestionsPractice ExamMath CenterCoursesPremiumAbout
Start Practicing
OperatorMaster

Free study tools for water and wastewater operators.

AccountSettingsAboutPricing and PaymentExam Prep BooksGet the iPhone AppSupportPrivacyTermsExam Disclaimer

Appearance

Operator Master is independent and is not affiliated with WPI, PSI, ABC, the Washington State Department of Ecology or any other state or provincial certification agency.

Level 1 · Entry sample questions

Math and Calculations Practice Questions for Level 1 · Entry

5 free sample questions on math and calculations for the Level 1 · Entry wastewater treatment operator exam. Try each one, then open the answer to check your work.

  1. Question 1

    A treatment plant receives 0.75 million gallons per day. What is the flow in gallons per day?

    1. 750 gallons per day
    2. 7,500 gallons per day
    3. 75,000 gallons per day
    4. 750,000 gallons per day
    Show the answer

    Answer: D. 750,000 gallons per day

    One million gallons equals 1,000,000 gallons, so 0.75 MGD equals 750,000 gallons per day. Calculation: 0.75 × 1,000,000 = 750,000 gallons per day.

  2. Question 2

    Influent BOD is 200 mg/L and effluent BOD is 40 mg/L. What is the BOD removal?

    1. 20%
    2. 40%
    3. 80%
    4. 160%
    Show the answer

    Answer: C. 80%

    The plant removes 160 mg/L from an influent concentration of 200 mg/L. Dividing the amount removed by the influent concentration gives 0.80, or 80%. Calculation: ((200 − 40) ÷ 200) × 100% = 80%.

  3. Question 3

    An aeration basin holds 500,000 gallons and receives a flow of 1.0 million gallons per day. What is the detention time in hours?

    1. 0.5 hours
    2. 12 hours
    3. 24 hours
    4. 48 hours
    Show the answer

    Answer: B. 12 hours

    Dividing basin volume by daily flow gives 0.5 day. Converting one-half day to hours gives 12 hours. Calculation: 500,000 gal ÷ 1,000,000 gal/day = 0.5 day; 0.5 day × 24 hr/day = 12 hours.

  4. Question 4

    A plant treats 1.0 MGD with an influent BOD concentration of 150 mg/L. What is the BOD loading in pounds per day?

    1. 1,251 lb/day
    2. 150 lb/day
    3. 8.34 lb/day
    4. 12,510 lb/day
    Show the answer

    Answer: A. 1,251 lb/day

    The pounds formula combines flow in MGD, concentration in mg/L, and the 8.34 conversion factor to calculate the daily BOD mass loading. Calculation: 1.0 × 150 × 8.34 = 1,251 lb/day.

  5. Question 5

    A plant flow is 1.44 MGD. What is the flow in gallons per minute?

    1. 1,440 gpm
    2. 10,000 gpm
    3. 1,000 gpm
    4. 694 gpm
    Show the answer

    Answer: C. 1,000 gpm

    Convert 1.44 million gallons to 1,440,000 gallons, then divide by 1,440 minutes per day to obtain 1,000 gallons per minute. Calculation: (1.44 × 1,000,000) ÷ 1,440 = 1,000 gpm.

Keep practicing

Practice All 50 Questions

Operator Master has 50 Level 1 · Entry math and calculations questions, free.

Start Level 1 · Entry PracticeWashington Group I Study Guide

More topics

Other Level 1 · Entry Topics

  • Plant Operations54 questions
  • Laboratory13 questions
  • Safety13 questions
  • Biological Treatment12 questions
  • Disinfection10 questions
  • Pumps and Hydraulics8 questions
  • Regulations and Compliance8 questions
  • Solids Handling8 questions
  • Primary Treatment6 questions
  • Secondary Clarification5 questions
  • Grit Removal4 questions
  • Headworks and Screening4 questions
Wastewater Math Formulas→

Operator Master is independent. It is not affiliated with WPI, PSI, ABC, the Washington State Department of Ecology or any other state or provincial certification agency, does not reproduce live exam content and does not guarantee a passing score.