Detention Time Calculator

How long wastewater stays in a tank, in hours, from the tank volume in gallons and the flow in MGD.

Calculator

Enter Your Numbers

Flow
500,000 gpd
Detention time
0.12 days
Detention time
2.88 hr

The formula

Formula

  • Detention time

    Detention Time = Volume ÷ Flow (units must be compatible)

    WPI Formula/Conversion Table (2023), Printed page 2 of 10, Detention Time

Worked example

Step by Step

A 60,000 gal tank receives a flow of 0.5 MGD. What is the detention time in hours?

  1. Put the flow in gallons per day to match the tank volume: 0.5 MGD × 1,000,000 gal/MG = 500,000 gpd.

  2. Divide the volume by the flow: 60,000 gal ÷ 500,000 gpd = 0.12 days.

  3. Change days to hours: 0.12 days × 24 hr/day = 2.88 hr.

Answer: 2.88 hr (about 2.9 hr)

Exam traps

Where People Lose Points

  • Dividing gallons by MGD without converting. 60,000 gal ÷ 0.5 MGD gives 120,000, which is not a time at all.
  • Stopping at days. Most exam answers want hours, so multiply days by 24 hr/day.
  • Leaving tank volume in cubic feet. Multiply ft³ by 7.48 gal/ft³ before dividing by a flow in gpd.

Practice

Try It Yourself

Practice detention timeFull detention time lesson

More calculators

Other Wastewater Math

  • Surface Overflow Rate Calculator
  • Chlorine Dose and Feed Calculator
  • F/M Ratio Calculator
  • Sludge Volume Index (SVI) Calculator

Operator Master is independent. It is not affiliated with WPI, PSI, ABC or any state or provincial certification agency, does not reproduce live exam content and does not guarantee a passing score. Check plant numbers against your facility's procedures.