Surface Overflow Rate Calculator

Clarifier surface overflow rate in gpd/ft², from the flow in MGD and a circular clarifier's diameter in feet.

Calculator

Enter Your Numbers

Clarifier area
1,962.5 ft²
Flow
1,200,000 gpd
Surface overflow rate
611 gpd/ft²

The formula

Formulas

  • Surface overflow rate

    Surface Overflow Rate, gpd/ft² = Flow, gpd ÷ Area, ft²

    WPI Formula/Conversion Table (2023), Printed page 6 of 10, Surface Loading Rate or Surface Overflow Rate

  • Area of a circle

    Area = (0.785)(Diameter²)

    WPI Formula/Conversion Table (2023), Printed page 1 of 10, Area of Circle

Worked example

Step by Step

A 50 ft diameter clarifier receives 1.2 MGD. What is the surface overflow rate?

  1. Find the surface area: 0.785 × 50 ft × 50 ft = 1,962.5 ft².

  2. Put the flow in gallons per day: 1.2 MGD × 1,000,000 gal/MG = 1,200,000 gpd.

  3. Divide the flow by the area: 1,200,000 gpd ÷ 1,962.5 ft² = 611 gpd/ft².

Answer: 611 gpd/ft²

Exam traps

Where People Lose Points

  • Using the radius in 0.785 × D². That formula takes the full diameter; with a radius, use 3.14 × r².
  • Dividing MGD by the area. The answer must be in gpd/ft², so convert the flow to gpd first.
  • Using the whole plant flow when two clarifiers share it. Split the flow among the clarifiers in service, or add their areas.

Practice

Try It Yourself

Practice tank area math

More calculators

Other Wastewater Math

  • Detention Time Calculator
  • Chlorine Dose and Feed Calculator
  • F/M Ratio Calculator
  • Sludge Volume Index (SVI) Calculator

Operator Master is independent. It is not affiliated with WPI, PSI, ABC or any state or provincial certification agency, does not reproduce live exam content and does not guarantee a passing score. Check plant numbers against your facility's procedures.